Study on the selection of TBM in consideration of field conditions

(사)한국터널지하공간학회 / (사)한국터널지하공간학회, (P)2233-8292; (E)2287-4747
2014, v.16 no.2, pp.125-133
https://doi.org/10.9711


  • Downloaded
  • Viewed

Abstract

In this study, TBM selection methods to meet soil and site conditions were presented. Factors and excavation equipment affecting TBM selection by soil and environmental condition were selected and classified. Weights between equipment and influencing factors selected were calculated by applying the AHP (Analytic Hierarchy Process) method. The results of the analysis influence factors, Ground condition was a major factor in objective factors and strength was a major factor in the hard condition of criteria factors and water pressure was a major factor in the soft ground condition of criteria factors. In Environment condition, existence of adjacent structures was evaluated more important than existence of feasible site. Lastly, Adequacy was verified through the deduction of results that coincide with input equipment by applying derived weights to actual site conditions.

keywords
TBM, 장비선정, AHP, TBM, TBM Selection, AHP

Reference

1.

1. AITES-ITA Working Group No. 14 (2000), Recommendations and Guidelines for Tunnel Boring Machines (TBMs), International Tunnelling and Underground Space Association, pp. 1-118.

2.

2. Bieniawski, Z.T., Celada, B., Galera, J.M., Tardaguila, I. (2008), “New applications of the excavability index for selection of TBM types and predicting their performance”, World Tunnel Congress 2008 - Underground Facilities for Better Environment and Safety, pp. 1618-1629.

3.

3. Bryson, N. (1999), “Generating consensus priority point vectors: A logarithmic goal programming”, Computers & Operations Research, Vol. 26, pp. 637-643.

4.

4. Edalat, K., Vahdatirad M.J., Ghodrat, H., Firouzian, S., Barari, A. (2010), “Choosing TBM for tabriz subway using multi criteria method”, Journal of civil engineering and management, Vol. 16, No. 4, pp. 531-539.

5.

5. German Tunnelling Committee Working Group (2000), Recommendations for selecting and evaluating tunnel boring machines, tunnel 5/97,Deutscher Ausschuß fur unterirdisches Bauen, pp 20-35.

6.

6. Hamidi, J.K., Shahriar, K., Rezai, B., Rostami, J., Bejari, H. (2010), “Risk assessment based selection of rock TBM for adverse geological conditions using Fuzzy-AHP”, Bulletin of Engineering Geology and the Environment, Vol. 69, No. 4, pp. 523-532.

7.

7. Kim, M.G., Lee, Y.S. (2008), “A suggestion of a new rock mass classification system”, Journal of the Korean Geotechnical society, Vol. 24, No. 11, pp. 43-53.

8.

8. Korea Express Corporation (1996), road design guideline, Vol. 2, part 5, pp. 41-42.

9.

9. Maidl, B, Herrenknecht, M, Maidl, U., Wehrmeyer, G. (2012), Mechanised Shield Tunnelling 2nd Edition, Ernst & Sohn, Germany, pp. 262-264, pp. 400-447.

10.

10. Mikhailov, L. (2004), “Group prioritization in the AHP by fuzzy preference programming method”, Computers & Operations Research, Vol. 31, pp. 293-301.

11.

11. Ramanathan, R., Ganesh, L.S. (1994), “Group preference aggregation methods employed in AHP: An evaluation and an intrinsic process for deriving members weightages”, European Journal of Operational Research, Vol. 79, pp. 249-265.

12.

12. Saaty, T.L. (1977), “A scaling method for priorities in hierarchy structures”, Journal of Mathematical Psychology, Vol. 15, No. 3, pp. 234-281.

13.

13. Saaty, T.L. (1980), The Analytic Hierarchy Process, McGraw-Hill, New York.

14.

14. Shahriar, K., Sharifzadeh, M., Hamidi, J.K., (2008), “Geotechnical risk assessment based approach for rock TBM selection in difficult ground conditions”, Tunnelling and Underground Space Technology, Vol. 23, pp. 318-325.

15.

15. Taheri, A., Borujeni, H.A.M. (2008), “Tunnelling machine selection for tunnel excavation in rock, using AHP method: CASE STUDY: Line 1 of the esfahan metro project”, International Conference and Exhibition on Tunnelling, International Tunnelling and Underground Space Association.

16.

16. Yazdani-Chamzini, A., Yakhchali, S.H. (2012), “TBM selection using fuzzy multicriteria decision making methods”, Tunnelling and Underground Space Technology, Vol. 30, pp. 194-204.