바로가기메뉴

본문 바로가기 주메뉴 바로가기

(사)한국터널지하공간학회

Development of simulation equipment system on EPB shield TBM hood operation

(사)한국터널지하공간학회 / (사)한국터널지하공간학회, (P)2233-8292; (E)2287-4747
2014, v.16 no.2, pp.193-201
https://doi.org/10.9711





  • Downloaded
  • Viewed

Abstract

This paper presents the development of simulation system on EPB shield TBM Hood operation. In recent, EPB shield TBM is widely used in the tunnel construction. Since the hood system of the EPB shield TBM is most important to excavate the tunnel, it is necessary to perform the simulation of hood system to investigate the design and operation parameters prior to tunnel construction. In order to carry out this study, the scaled simulation system was designed and developed. The model tests were performed to verify the developed system. During the simulation, the earth pressures developed in the chamber during tunnelling were measured to evaluate the operation technique. The test results obtained by the developed simulation system show clearly the similar behaviour of TBM hood compared with the field data. It was also found that the ground loss during tunnelling is dependent on the change of earth pressure in chamber. Therefore, the simulation system developed in this study will be very useful to evaluate the operation technique of the TBM hood prior to tunnel construction. In addition, this system will be applied in a various condition of ground to get the operating information.

keywords
토압식 쉴드TBM의 후드부, 스크류 컨베이어, 챔버, 모형실험시스템, Hood of EPB shield TBM, Screw conveyor, Chamber, Simulation system

Reference

1.

1. Owen, P.J., Cleary, P.W. (2009), “Prediction of 스크류 컨베이어 performance using the Discrete Element Method (DEM)”, Powder Technology, Vol. 193, No. 3, pp. 274-288.

2.

2. Raffaele Vinai, Claudio Oggeri, Daniele Peila (2008), “Soil conditioning of sand for EPB applications : A laboratory research”, Tunnelling and Underground Space Technology, Vol. 23, No. 3, pp. 308-317.

3.

3. YU, Y., Arnold, P.C. (1997), “Theoretical modelling of torque requirements for single Screw feeders”, Powder Technology Vol. 93, No. 1, pp. 151-162.

4.

4. Kim, S.H, Kim, J.D., Park, I.J. (2011), “An experimental study on screw conveyor system of EPB shield TBM”, Korean Tunnelling and Underground Space Association, Vol. 13, No. 6, pp. 519-530.

5.

5. Jang, S.H., Lee, S.W. (2006), “Design technique of TBM cutter head”, Korean geotechnical society, Vol. 22, No. 1, pp. 22-23.

6.

6. Korean Tunnelling and Underground Space Association (2008) “A series of tunnel engineering 3 the mechanized tunneling techniques-Design”, CIR, pp. 27-32, 156.

7.

7. Han, M.S., Kim, Y.J., Shin, I.J., Lee, Y.J., Shin, Y.S., Kim, S.H. (2013) “Simulation of shield TBM tunneling in soft ground by laboratory model test”, Korean Tunnelling and Underground Space Association, Vol. 15, No. 5, pp. 483-496.

8.

8. 社団法人 地盤工学会. (1997), “シールド工法の調査、設計から施{工まで, 日本}, pp. 145. pp. 27-29

(사)한국터널지하공간학회