Model test on operation efficiency in the screw conveyor of shiled TBM in soft ground

(사)한국터널지하공간학회 / (사)한국터널지하공간학회, (P)2233-8292; (E)2287-4747
2014, v.16 no.2, pp.203-211
https://doi.org/10.9711





  • Downloaded
  • Viewed

Abstract

This paper presents the screw conveyor operation efficiency of shield TBM in soft ground. In order to study the screw conveyor operation efficiency, the experimental and theoretical studies were carried out. In experimental study, the operating amounts of muck were examined and compared due to the screw conveyor operating parameters including types (Shaft and Ribbon screw), angles of screw and conveyor. The results obtained from the laboratory model tests were analysed and evaluated to suggest the most suitable muck operating parameters during the shield TBM tunnelling in soft ground. In conclusion, it is found the operation parameters to increase the screw conveyor efficiency. In addition, the information presented in this paper may be useful for developing the design technology of shield TBM in the future.

keywords
Shield TBM, 스크류 컨베이어, 배토 효율, 연약지반, 축소모형시험, Shield TBM, Screw conveyor, Operation efficiency, Soft ground, Model test

Reference

1.

1. Kim, S.H., Kim, J.D., Park, I.J. (2011), “An experimental study on screw conveyor system of EPB shield TBM”, Korean Tunnelling and Underground Space Association, Vol. 13, No. 6, pp. 519-530.

2.

2. Kim, S.H., Oh, T.S., Park, S.H., Lee, C.Y., Park, J.K. (2014), “Development of simulation eguipment system on EPB shield TMB hood operation”, Korean Tunnelling and Under ground Space Association, Vol. 16, No. 2, pp. 193-201.

3.

3. Jang, K.G. (2008), “A study on Influence of the TBM Equipment Thrust on Segments during Excavation of Rockbed for Large-Diameter Shield Tunnel”, Yonsei University.

4.

4. Korean Tunnelling and Underground Space Association (2008), “A series of Tunnel engineering 3 The mechanized tunneling techniques-Design”, CIR, pp. 27-32, 156.

5.

5. Han, M.S., Kim, Y.J., Shin, I.J., Lee, Y.J., Shin, Y.S., Kim, S.H. (2013), “Simulation of shield TBM tunneling in soft ground by laboratory model test”, Korean Tunnelling and Underground Space Association, Vol. 15, No. 5, pp. 483-496.

6.

6. Merritt, A.S., Mair, R.J. (2006), “Mechanics of tunnelling machine screw conveyor : model tests”, Geotechnique, Vol. 56, No. 9, pp. 605-615.

7.

7. Merritt, A.S., Mair, R.J. (2008), “Mechanics of tunnelling machine screw conveyor : a theoretical model”, Geotechnique, Vol. 58, No. 2, pp. 79-94.

8.

8. Roberts, A.W. (1999), “The influence of granular vortex motion on the volumetric performance of enclosed screw conveyors”, Powder Technology, pp. 56-67.

9.

9. Bezuijen, A., Schamine'e, P.E.L. (2001), “Simulation of the EPB-Shield TBM in model tests with foam as additive”, Proceedings of Congress on Modern Tunnelling Science and Technology, pp. 935-940.

10.

10. Daniele Peila, Claudio Oggeri and Raffaele vinai (2007), “Screw conveyor device for laboratory tests on conditioned soil for EPB tunneling operations”, Journal of Geotechnical and Geoenvironmental Engineering, Vol. 133, No. 12, pp. 1622-1625.

11.

11. Owen, P.J, Cleary, P.W. (2009), “Prediction of screw conveyor performance using the Discrete Element Method (DEM)”, Powder Technology, Vol. 193, No. 3, pp. 274-288.

12.

12. Raffaele Vinai, Claudio Oggeri and Daniele Peila (2008), “Soil conditioning of sand for EPB applications: A laboratory research”, Tunnelling and Underground Space Technology, Vol. 23, No. 3, pp. 308-317.

13.

13. MIGUEL ÁNGEL PEÑA DUARTE (2007), “Foam as a soil conditioner in tunnelling:physical and mechanical properties of conditioned sands”, The University of Oxford.

14.

14. 社団法人 地盤工学会 (1997), “シールド工法の調査、設計から施工まで”, 日本, pp. 145.