This paper is to perform 3-dimensional numerical analysis considering face pressure, backfill pressure, excavation length, soil model and element size for selecting key factors of ground surface settlement due to shield TBM advancement. According to the numerical analysis results, backfill pressure and soil model are governing factors inducing ground surface settlement. To complement this study, the ground conditions and characteristics of the boring machine will be considered using numerical analysis.

keywords
Shield TBM 터널, 3차원 수치해석, 뒤채움압, 지반모델, Shield tunneling, 3-D numerical analysis, Backfill pressure, Soil model

Reference

1.

1. Cho, J.S. (2008), “Analysis of ground movements and lining segment in shield TBM based on three dimensional finite element method”, Pukyong National University, pp. 15-25.

2.

2. LIM KEN CHAI (2003), “Three-dimensional finite element analysisof earth pressure balance tunnelling”, national university of singapore, pp. 121-198.

3.

3. SVEN CHRISTIAN MÖ LLER. (2006), “Tunnel induced settlements and structural forces in linings”, Eigenverlag des Instituts für Geotechnik, pp. 108-111.

(사)한국터널지하공간학회