Refurbishment of a 3.6 m earth-pressure balanced shield TBM with a domestic cutterhead and its field verification

(사)한국터널지하공간학회 / (사)한국터널지하공간학회, (P)2233-8292; (E)2287-4747
2015, v.17 no.4, pp.457-471






  • Downloaded
  • Viewed

Abstract

A domestic cutterhead with the diameter of 3.6 m was designed and manufactured in this study. Then, it was attached to an existing earth-pressure balanced shield TBM to excavate a cable tunnel with the length of 1,275 m. Especially, the procedures for TBM cutterhead design and its corresponding performance prediction were also summarized. From field data analyses of the refurbished shield TBM, its maximum advance rate was recorded as 14.4 m/day. Penetration depths of disc cutters were found to be approximately 4 mm/rev, which is equal to the maximum penetration depth designed for the strongest rock strength condition in the target tunnel. Every TBM operating thrust and cutter normal force during TBM driving was much smaller than their corresponding maximum capacities. When cutter acting forces recorded in the field were analyzed, their prediction errors by the CSM model were very high for weak rock conditions. In addition, rock strength showed very close relationships with cutter normal force and penetration depth.

keywords
TBM, 커터헤드, 재활용, 디스크커터, 굴진율, 굴진성능, TBM, Cutterhead, Refurbishment, Disc cutter, Advance rate, Excavation performance

Reference

1.

1. Ates, U., Bilgin, N., Copur, H. (2014), Estimating torque, thrust and other design parameters of different type TBMs with some criticism to TBMs used in Turkish tunneling projects, Tunnelling and Underground Space Technology, Vol. 40, pp. 46-63.

2.

2. Bae, G.-J., Chang, S.-H., Park, Y.-T., Choi, S.-W., Lee, G.-P., Kwon, J.-Y., Han, K.-T. (2014), “Manufacturing of an earth pressure balanced shield TBM cutterhead for a subsea discharge tunnel and its field performance analysis”, Journal of Korean Tunnelling and Underground Space Association, Vol. 16, No. 2, pp. 161-172 (in Korean).

3.

3. Bae, G.-J., Chang, S.-H. (2006), “Improvement and evaluation of TBM performance by considering construction risk”, Proceedings of the 7th Symposium on Mechanized Tunnelling Technology, pp. 11-45(in Korean).

4.

4. Cho, Jung-Woo, Jeon, Seokwon, Jeong, Ho-Yeong, Chang, Soo-Ho (2013), Evaluation of cutting efficiency during TBM disc cutter excavation within a Korean granitic rock using linear-cuttingmachine testing and photogrammetric measurement, Tunnelling and Underground Space Technology, Vol. 35, pp. 37-54.

5.

5. Chang, S.-H., Choi, S.-W., Park, Y.-T., Lee, G.-P., Bae, G.-J. (2012), “Characterization of the deformation of a disc cutter in linear rock cutting test”, Journal of Korean Tunnelling and Underground Space Association, Vol. 14, No. 3, pp. 197-213(in Korean).

6.

6. Chang, S.-H., Choi, S.-W., Lee, G.-P., Bae, G.-J. (2011), “Rock TBM design model derived from the multi-variate regression analysis of TBM driving data”, Journal of Korean Tunnelling and Underground Space Association, Vol. 13, No. 6, pp. 531-555 (in Korean).

7.

7. Gütter, W., Jägger, M., Rudigier, G., Weber, W. (2011), “TBM versus NATM from the contractor’s point of view”, Geomechanics and Tunnelling, Vol. 4, No. 4, 327-336.

8.

8. Huo, J., Sun, W., Chen, J., Zhang, X. (2011), Disc cutters plane layout design of the full-face rock tunnel boring machine (TBM) based on different layout patterns, Computers & Industrial Engineering, Vol. 61, pp. 1209-1225.

9.

9. Jodl, H.G., Resch, D. (2011), “NATM and TBM – comparison with regard to construction operation”, Geomechanics and Tunnelling, Vol. 4, No. 4, 337-345.

10.

10. MLIT (Ministry of Land, Infrastructure and Transport) (2011), Annual Report – Development of optimized TBM cutterhead design method and high-performance disc cutter.

11.

11. Rostami, J. (2013), “Study of pressure distribution within the crushed zone in the contact area between rock and disc cutters”, International Journal of Rock Mechanics & Mining Sciences, Vol. 57, pp. 172-186.

12.

12. Rostami, J. (2008), “Hard Rock TBM Cutterhead Modeling for Design and Performance Prediction”, Geomechanik und Tunnelbau, Vol. 1, pp. 18-28.

13.

13. Rostami, J., Ozdemir, L., Nisen, B. (1996), “Comparison Between CSM and NTH Hard Rock TBM Performance Prediction Models”, Proc. of ISDT 1996, Las Vegas NV, pp. 1-11.

14.

14. Rostami, J. Ozdemir, L. (1993), “A New Model for Performance Prediction of Hard Rock TBMs”, Proc. of Rapid Excavation and Tunneling Conference (RETC), Boston, USA, pp. 793-809.

15.

15. Wang, L., Gong. G., Shi, H., Yang, H. (2012), “Modeling and analysis of thrust force for EPB shield tunneling machine, Automation in Construction”, Vol. 27, pp. 138-146.

(사)한국터널지하공간학회