A preliminary study on the excavation sequence of a room-and-pillar underground structure by the drill-and-blast method

(사)한국터널지하공간학회 / (사)한국터널지하공간학회, (P)2233-8292; (E)2287-4747
2015, v.17 no.6, pp.605-614




  • Downloaded
  • Viewed

Abstract

A room-and-pillar underground structure is characterized by its grid-type array of room and pillar. As a result, its construction and economical efficiency can be governed by excavation sequence. In this study, the construction period by the drill and blast method which can be treated as a main sequence for excavation was examined by considering the regulation for blasting and construction standard of estimation in Korea. To evaluate the construction period for the room-and-pillar underground structure constructed in 4 kinds of square-type area (30×30~57×57 m), the concurrent excavation pattern which was suggested in the previous researches was used. From the suggested condition, the total construction period by drill-and-blast method can be estimated with the consideration of the construction area, number of jumbo drill and faces in operation.

keywords
주방식 지하구조물, 발파굴착, 굴착, 굴착공기, Room-and-pillar underground structure, Drill and blasting, Excavation, Construction period

Reference

1.

1. Chun, J., So, B., Choo, J, Woo, S. (2005), “Simulation based productivity analysis for NATM operations”, Journal of the Korean Society of Civil Engineers, Vol. 25, Issue. 3D, pp. 457-462 (in Korean).

2.

2. Darling, P. (2011), Mining Engineering handbook, Society for Mining, Metallurgy and Exploration, INC.(SME), 3rd Edition.

3.

3. Hartman, H.L., Mutmansky, J.M. (2002), Introductory Mining Engineering. 2nd edition, Wiley, New Jersey.

4.

4. Hoek, E., Brown, E.T. (1980), Underground Excavation in Rock, Institution of Mining and metallurgy.

5.

5. Korea Express Corporation (2000), Construction management for drill-and-blasting method in tunnel (in Korean).

6.

6. Lee, C., Hwang, J., Kim, E., Chang, S-H. (2014a), “Consideration on design procedure of room-andpillar underground structure, Part I: parametric study”, J. of Korean Tunn Undergr Sp Assoc, Vol. 16, No. 5, pp 487-495 (in Korean).

7.

7. Lee, C., Hur, J., Hyun, Y., Chang, S-H. (2014b), “Consideration on design procedure of roomand-pillar underground structure, Part II: selection of shape to design supports”, J. of Korean Tunn Undergr Sp Assoc, Vol. 16, No. 5, pp 497-506(in Korean).

8.

8. MLTO (Ministry of Land, Infrastructure and Transport Ordinary) (2011), Standard Estimating System of Construction (in Korean).

9.

9. Svanholm, B.O., Persson, P.A., Larsson, B. (1977), “Smooth blasting for reliable underground openings”, In Rockstore 77: Storage in excavated rock caverns, proc. 1st Int. Symp., Stockholm, (ed. M. Bergman), pp. 573-579. Oxford: Pergamon.

(사)한국터널지하공간학회