바로가기메뉴

본문 바로가기 주메뉴 바로가기

ACOMS+ 및 학술지 리포지터리 설명회

  • 한국과학기술정보연구원(KISTI) 서울분원 대회의실(별관 3층)
  • 2024년 07월 03일(수) 13:30
 

logo

개착식 터널 프리캐스트 아치 구조물의 변형거동 연구

Investigation for the deformation behavior of the precast arch structure in the open-cut tunnel

(사)한국터널지하공간학회 / (사)한국터널지하공간학회, (P)2233-8292; (E)2287-4747
2019, v.21 no.1, pp.93-113
https://doi.org/10.9711/KTAJ.2019.21.1.093
김학준 (대전대학교)
이규필 (한국건설기술연구원)
임철원 (후레씨네코리아)
  • 다운로드 수
  • 조회수

Abstract

The behavior of the 3 hinged precast arch structure was investigated by comparing field measurements with numerical analyses performed for precast lining arch structures, which are widely used for the open-cut tunnel. According to the field measurements, the maximum vertical displacement occurred at the crown with upward displacements during the backfilling up to the crown of the arch and downward displacements at the backfill height above the crown. The final crown displacement was 19 mm upward from the original position. The horizontal displacement at the sidewall, which had a maximum horizontal displacement, occurred inward of the arch when compacting the backfill up to the crown and returned to the original position after completing the backfill construction. According to the analysis of displacement measurements, economical design is expected to be possible for precast arch structures compared to rigid concrete structures due to ground-structure interactions. Duncan model gave good results for the estimation of displacements and deformed shape of the tunnel according to the numerical analyses comparing with field measurements. The earth pressure coefficients calculated from the numerical analyses were 0.4 and 0.7 for the left and the right side of the tunnel respectively, which are agreed well with the eccentric load acting on the tunnel due to topographical condition and actual field measurements.

keywords
Open-cut tunnel, Precast lining, 3 hinged, Precast arch structure, Duncan model, 개착식 터널, 프리캐스트 라이닝, 3힌지, 프리캐스트 아치 구조물, Duncan 모델

참고문헌

1.

1. An, J.W. (2012), Modeling technique of precast cut and cover tunnel lining, M.Sc. Thesis, Department of Civil Engineering, Sangji University, pp. 78.

2.

2. Bae, G.J., Lee, G.P. (2001), “A study of modelling methods used for the analysis on cut-and-cover tunnel lining”, Journal of Korean Tunnelling and Underground Space Association, Vol. 3, No. 2, pp. 13-22.

3.

3. Bae, G.J., Lee, S.W., Lee, G.P., Park, S.H. (2002), “A study on the behavior of cut and cover tunnel according to the excavation plane by numerical analysis”, Journal of Korean Tunnelling and Underground Space Association, Vol. 4, No. 1, pp. 79-90.

4.

4. Brockbank, B., Dunphy, R., Yasinko, L. (1994), “Innovative underpass for Highway 63, Syncrude, Alberta”, Proceedings of the International Road Federation Conference and Exposition, Transportation Association of Canada, Ottawa, Ontario, Canada, Vol. 9.

5.

5. Clough, G.W., Duncan, J.M. (1991), Foundation engineering handbook, 2nd edition, H.Y. Fang, ed., Chapman and Hall, New York, pp. 223-235.

6.

6. Duncan, J.M., Byrne, P., Wong, K., Mabry, P. (1980), Strength, stress-strain and bulk modulus parameters for finite element analysis of stresses and movements in soil masses, Report No. UCB/GT/80-01, Dept. of Civil Engineering, Uni. of California, Berkeley, USA, pp. 70.

7.

7. Duncan, J.M., Chang, C.Y. (1970), “Nonlinear analysis of stress and strain in soils”, ASCE Journal of the Soil Mechanics and Foundation Division, Vol. 96, No. SM5, pp. 1629-1653.

8.

8. Hutchinson, D. (2004), Application and design of segmental precast arches, Geotechnical Engineering for Transportation Projects, pp. 452-459.

9.

9. Hwang, C.H. (2009), Behavior of the cut-and-cover tunnel in unsymmetrical condition, M.Sc. Thesis, Department of Construction and Transportation Engineering, Ajou University, pp. 60.

10.

10. Janusz, L., Vaslestad, J., Miglio, A. (2018), Fifty years of culverts and soil-structure interaction, european experience, Culverts and Soil Structure Interaction, Transportation Research Circular, No. E-C230, Transportation Research Board, pp. 21-33.

11.

11. Jenkins, D.A. (1998), “Non-linear analysis of buried arch structures”, Proceedings of the Australia Structural Engineering Conference, Auckland.

12.

12. Jinsung Construction Co. (2008), Design and develop the engineering method of cut-and-cover tunnel using the precast arch of using rib-reinforcement, Construction and Transportation Research R&D Report, R&D/06-C19, pp. 216.

13.

13. Katona, M. (2018), History of soil-structure interaction models for buried culverts, Culverts and Soil Structure Interaction, Transportation Research Circular, No. E-C230, Transportation Research Board, pp. 13-20.

14.

14. Lee, G.P. (2004), Evaluation of earth pressure applied on arch shaped cut and cover tunnel, Ph.D. Thesis, Department of Civil Engineering, Hanyang University, pp. 129.

15.

15. Lee, G.P., Hwang, J.H., Shin, H.S., Hong, S.K. (2010), “Mechanical behavior of waterway culvert structure assembled by precast segments”, Journal of Korean Tunnelling and Underground Space Association, Vol. 12, No. 2, pp. 193-200.

16.

16. Lee, G.P., Lee, S.W., Shin, H.S., Hwang, J.H. (2008), “Mechanical behavior of tunnel liner using precast segment reinforced by rib”, Journal of Korean Tunnelling and Underground Space Association, Vol. 10, No. 3, pp. 295-302.

17.

17. Lee, S.W. (2009), “Tunnelling method using precast segment reinforced by rib”, Nature, Human, and Tunnel, Magazine of Korean Tunnelling and Underground Space Association, Vol. 11, No. 2, pp. 59-69.

18.

18. Lee, S.W., Lee, G.P., Bae, G.J. (2003), “A study on the behavior of cut and cover tunnel by numerical analysis”, Journal of Korean Tunnelling and Underground Space Association, Vol. 5, No. 1, pp. 43-54.

19.

19. Mahgoub, A., Naggar, H.E. (2018), “Effect of the cross-sectional rigidity on the static and seismic behavior of CSP culverts”, Proceedings of the 3rd World Congress on Civil, Structural, and Environmental Engineering, Paper No. ICGRE 153, Budapest, Hungary, pp. 1-9.

20.

20. Marston, A., Anderson, A.O. (1913), The theory of loads on pipes in ditch and tests of cement and clay drain tile and sewer pipe, Iowa State College of Agriculture, Ames, Iowa, pp. 181.

21.

21. Matsuzawa, H., Hazarika, H. (1996), “Analyses of active earth pressure against rigid retaining wall subjected to different modes of movement”, Soils and Foundations, Vol. 36, No. 3, pp. 51-65.

22.

22. McGrath, T.J. (2018), Development of design and analysis methods for buried culverts, Culverts and Soil Structure Interaction, Transportation Research Circular, No. E-C230, Transportation Research Board, pp. 1-12.

23.

23. McGrath, T.J., Moore, I.D., Selig, E.T., Webb, M.C., Taleb, B. (2002), Design examples for large-span culverts, NCHRP Report No. 473, Transportation Research Board, National Research Council, pp. 39.

24.

24. Montgomery, C.J., Morison, R.M., Channon, J.R., Tutty, D.O. (1993), “Design and construction of a buried precast prestressed concrete arch”, Journal of Prestressed Concrete Institute, Vol. 38, No. 1, pp. 40-57.

25.

25. Nakai, T. (1985), “Finite element computations for active and passive earth pressure problems of retaining wall”, Soils and Foundations, Vol. 25, No. 3, pp. 98-112.

26.

26. Sawamura, Y., Ishihara, H., Kishida, K., Kimura, M. (2016), “Mechanical behavior of three-hinge precast arch culvert in construction process through model experiment”, Proceedings of the 6th Japan-Korea Geotechnical Workshop, Japanese Geotechnical Society Special Publication, Tsushima Campus, Okayama University, Japan, pp. 128-131.

27.

27. Segrestin, P., Brockbank, W. (1995), “Precast arches as innovative alternative to short-span bridges”, Proceedings of the 4th International Bridge Engineering Conference, San Francisco, CA, pp. 219-226.

28.

28. Spangler, M. G. (1948), “Underground conduits, An appraisal of modern research”, Transactions American Society of Civil Engineering, Vol. 113, No. 1, pp. 316-374.

29.

29. Zhu, B., Kou, W., Li, H., Li, G. (2016), “Finite element analysis for bearing capacity of prefabricated arch culverts”, The Open Construction and Building Technology Journal, Vol. 10, pp. 457-465.

(사)한국터널지하공간학회