A study on the face pressure control and slurry leakage possibility using shield TBM model test

(사)한국터널지하공간학회 / (사)한국터널지하공간학회, (P)2233-8292; (E)2287-4747
2020, v.22 no.3, pp.277-291
https://doi.org/10.9711/KTAJ.2020.22.3.277




  • Downloaded
  • Viewed

Abstract

Shield TBM is a tunnelling method that has a wider range of applications in the poor ground condition compared to conventional tunnels (Drill and Blast). Currently, a 13.3m large-diameter slurry shield TBM is preparing for construction to pass under the Han River. Shield TBM is divided into slurry and EPB shield TBM, and management items during construction are different depending on each characteristic. In this paper, the equipment type, origin, application case and trouble case were analyzed for slurry shield TBM, which is mainly constructed in soft ground. In addition, 2D and 3D model tests were conducted on the condition of soil depth for the possibility of slurry leakage into front of the equipment, with appropriate chamber pressure. Based on this paper, it proposed to provide basic and reference data for proper excavation surface pressure and chamber pressure during construction of slurry shield TBM under soft ground conditions, and proposed measures to minimize stability and environmental decline due to slurry ejection.

keywords
이수압식 쉴드 TBM, 굴진면 토압, 이수 분출, Slurry shield TBM, Excavation surface pressure, Slurry leakage

(사)한국터널지하공간학회