바로가기메뉴

본문 바로가기 주메뉴 바로가기

(사)한국터널지하공간학회

A Case study on the construction of a long tunnel in the youngdong railroad (Mt. Dongbaek-Dokye)

(사)한국터널지하공간학회 / (사)한국터널지하공간학회, (P)2233-8292; (E)2287-4747
2002, v.4 no.2, pp.154-165





  • Downloaded
  • Viewed

Abstract

This paper presents a case study on the construction of a long tunnel named as Solan tunnel , which connects between Mt. Dongbaek station and Dokye station in the Youngdong Railroad. The tunnel will be the longest tunnel with length of 16.4 km in Korea when completed. The tunnel site is located in a complex geological region with faults, cavities and coal measures. In construction of adit No. 2, geophysical investigation methods such as electrical resistivity method and GPR(Ground Penetration Radar) were used to detect faults, cavities and coal measures in advance with some success. The geophysical investigation results and in-situ boring data were used as feedback to improve tunnel reinforcement design. Also, the tube umbrellas of grouted steel pipes were found to have a good reinforcement and grouting effects in zones of faults, cavities. In zones of coal measures, swellex rockbolts with mortar grouting were verified as successful.

keywords
Long tunnel, fault, cavity, coal measure, electrical resistivity method, GPR, tube umbrella of grouted steel pipe, swellex rockbolt, Long tunnel, fault, cavity, coal measure, electrical resistivity method, GPR, tube umbrella of grouted steel pipe, swellex rockbolt, 장대터널, 단층, 공동, 함탄층, 전기비저항탐사, 지하레이다탐사, 강관다단그라우팅, 스웰렉스 록볼트

(사)한국터널지하공간학회