바로가기메뉴

본문 바로가기 주메뉴 바로가기

(사)한국터널지하공간학회

A Study on the Estimation of Stress Relaxed Zone around a Tunnel Periphery for the Design of 2-Arch Tunnel Lining

(사)한국터널지하공간학회 / (사)한국터널지하공간학회, (P)2233-8292; (E)2287-4747
2005, v.7 no.4, pp.343-352

  • Downloaded
  • Viewed

Abstract

In this study, the existing methods proposed to estimate the relaxed load due to a tunnel excavation are compared and analyzed. Also a new approach, by which the stress relaxed zone around an excavated tunnel periphery can be systematically estimated, was suggested for the design of 2- arch tunnel lining. To this end, local factors of safety are calculated from the redistributed stresses after the excavation of a tunnel. The height of the relaxed load is inferred based on the assumption that the stress relaxed zone might coincide with the region corresponding to the local safety factor of 2.0 or 3.0. The new approach proposed in this study has the advantage of estimating the height of the relaxed load independent of the shape of a tunnel and the ground conditions. Since the height of the relaxed load is estimated according to the local factor of safety, which is a relatively clear criterion, the designer's subjectivity involved in the design of concrete tunnel lining might be reduced.

keywords
Relaxed stress zone, height of relaxed load, local factor of safety, tunnel lining, 2-arch tunnel, Relaxed stress zone, height of relaxed load, local factor of safety, tunnel lining, 2-arch tunnel, 이완영역, 이완하중고, 국부안전율, 터널 라이닝, 2-arch 터널

Reference

1.

(1974189-236) “Engineering Classification of Rock Masses for the Design of Tunnel Support”,

2.

(1999) Fast Lagrangian Analysis of Continua, Inc

3.

(1982) Symposium on Rock Mechanics,

4.

(1973) The art of tunnelling,

5.

(1946) “Rock Defects and Loads on Tunnel Support” Rock Tunneling with Steel Supports,

6.

(1983) Design Guideline and Roof Control Standards for Coal Mine Roofs, The Pennsylvania State University

7.

(2003) “Terzaghi 터널토압의 재조명에 관한 연구”,

8.

(2000) “연약 암반층에 굴착된 터널의 안전율 평가”,

9.

(1995) 터널・지하공간 굴착공법, 구미서관

10.

(2001) “NATM 터널 콘크리트 라이닝 설계하중에 관한 연구” ,

(사)한국터널지하공간학회