enlarging an existing tunnel under operation, unexpected excessive overbreaks and large cavities around the tunnel were found. It was an issue that they might influence the stability of the new tunnel. The overbreaks and cavities are assumed that they were attributed to excessive blasting under the condition of insufficient ground investigation. To enlarge the existing tunnel safely, therefore, a remedy measure for the overbreaks and cavities is suggested.
(1999) OO~OO간(지방도 341호선) 도로확・포장공사 실시설계 토질조사보고서,
(2002) 산・학인을 위한 발파공학,
(2001) 석회암 공동지역에서의 터널시공,
(2000) 발파에 의한 터널 주변 암반의 손상영역 평가에 관한 연구,
(2000) FLAC 2D User’s Guide,