해저 터널 굴진자료 분석을 통한 FPI와 비에너지의 경험식 제시

Suggestion of empirical formula between FPI and specific energy through analysis of subsea tunnel excavation data

(사)한국터널지하공간학회 / (사)한국터널지하공간학회, (P)2233-8292; (E)2287-4747
2018, v.20 no.4, pp.687-699
https://doi.org/10.9711/KTAJ.2018.20.4.687
김경열 (한전 전력연구원)
배두산 (한국전력공사)
조선아 (한전전력연구원)
류희환 (한국전력공사)

Abstract

The construction of subsea tunnel differs from that of inland tunnel because of high water pressure due to sea water level and difficulties to reinforce the ground under construction. Therefore, it is very important to prevent trouble in advance when the subsea tunnel is constructed. In this paper, we established lots of databases about characteristics of geological and mechanical parameters on the construction of subsea tunnel using micro slurry TBM which depth is about 60 m. The correlation analysis is conducted to confirm the effect of thrust, torque and RPM among the excavation database on the net penetration rate. Also, An empirical formula is suggested to predict the net penetration rate through the correlation analysis between FPI (Field Penetration Index) and specific energy from the subsea tunnel excavation database.

keywords
해저 터널, 슬러리 TBM, 막장압, 비에너지, 굴착 변수, Subsea tunnel, Slurry TBM, Face pressure, Specific energy, Excavation parameter

참고문헌

1.

Albert, T.Y. (2017), Design and construction of Hong Kong - Zhuhai - Macao bridge project, <TEX>$I^{3}C$</TEX> Symposium on Infrastructural Developments, Singapore, pp. 1-39.

2.

Bieniawski, R.Z.T., Celada, B., Tardaguila, I., Rodrigues, A. (2012), "Specific energy of excavation in detecting tunnelling conditions ahead of TBMs", Tunnels & Tunnelling International, February 1, pp. 65-68.

3.

Bilgin, N., Feridunoglu, C., Tumac, D. (2005), The performance of a full face tunnel boring machine (TBM) in Tarabya (Istanbul), Talor & Francis Group, London, pp. 821-826.

4.

Burger, W., Arioglu, E. (2015), Istanbul strait road tunnel crossing: Project challenges and TBM solutions, AFTES Journees Techniques, Lyon, pp. 1-12.

5.

Celada, B., Galera, J.M., Munoz, C., Tardaguila, I. (2009), The use of the specific drilling energy for rock mass characterization and TBM driving during tunnel construction. Proceedings of the ITA-AITES World Tunnel Congress, Hungary, pp. 1-13.

6.

Copur, H., Tuncdemir, H., Bilgin, N., Dincer, T. (2001), "Specific energy as a criterion for the use of rapid excavation system in Turkish mines, Mining Technology", Vol. 110, No. 3, pp. 149-157.

7.

Hamilton, W.H., Dollinger, G.L. (1979), "Optimizing tunnel boring machine and cutter design for greater boreability", Proceedings of the Rapid Excavation and Tunneling Conference, Vol. 1, Atlanta, pp. 280-296.

8.

ITA (2001), Recommendations and guidelines for tunnel boring machines, WG.14, Techanical Tunnelling, International Tunnelling Association, pp. I1 - I8.

9.

KEPCO (2014), <TEX>${\bigcirc}{\bigcirc}$</TEX> cable tunnel geotechnical investigation report, pp. 96-151.

10.

Kim, K.Y., Lee, D.S., Cho, J., Jeong, S.S., Lee, S. (2013), "The effect of arching pressure on a vertical circular shaft", Tunnelling and Underground Space Technology, Vol. 37, pp. 10-21

11.

Lee, H.L., Song, K.I., Kim, K.Y. (2017), "Development and implementation of statistical prediction procedure for field penetration index using ridge regression with best subset selection", Journal of Korean Tunnelling and Underground Space Association, Vol. 19, No. 6, pp. 857-870.

12.

Phil Stride (2016), Building for 22nd century London, OSLO, Tideway, pp. 1-37.

13.

RASA (2016), DHL-3500 slurry shield machine inspection report, pp. 1-12.

14.

Rostami, J. (2016), "Performance prediction of hard rock Tunnel Boring Machines (TBMs) in difficult ground", Tunnelling and Underground Space Technology, Vol. 57, pp. 173-182.

15.

Singapore Power (2018), Cable tunnel project, pp. 3-9.

16.

Teale, R. (1965), The concept of specific energy in rock drilling, International Journal of Rock Mechanics and Mining Sciences & Geomechanics Abstracts, Vol. 2, No. 1, pp. 57-73.

17.

Townsend, B.F., Jenkins, P.E. (2009), TBM selection and specification, Mott Macdonald, pp. 1-18.