The objective of this study is to propose the drainage system that has been improved the workability, waterproofing and drainage performance to treat the leakage from the cement concrete structures in underground. It is improved that the pipe for conveying ground leak in the existing drainage system had the problem in workability and waterproof. The drainage systems with the improved pipe for conveying ground leak were constructed in conventional concrete lining tunnels to evaluate the workability, waterproofing and drainage. The waterproof and the drainage performance of the drainage system was evaluated by injecting 1,000 ml of red water in the back of the drainage system at 3 weeks, 6 weeks, 9 weeks, 11 weeks, 14 weeks, 17 weeks and 23 weeks. During 6 months of field performance test, the average daily temperature of the tunnel site was measured from -12.4°C to 19.7°C. The daily minimum temperature was -17.2°C and the daily maximum temperature was 26.7°C. There was no problem in waterproof and drainage performance on the pipe for conveying ground leak and the drainage system during 6 months for field performance test. It is concluded that the improved drainage system can be applied to various cement concrete underground structures where leakage occurs, and has little seasonal effect.

keywords
콘크리트 구조물, 누수, 유도배수, 차수, 지하, Cement concrete structure, Leakage, Drainage, Waterproof, Underground

참고문헌

1.

1. Choo, J.H., Park, S.W., Kim, H.T., Jee, K.H., Yoon, T.G., (2011), “Analysis and cause of occurrence of lining cracks on NATM tunnel based on the precise inspection for safety and diagnosis - Part I”, Journal of Korean Tunnelling and Underground Space Association, Vol. 13, No. 3, pp. 199-214.

2.

2. Federal Highway Administration and Federal Transit Administration (2004), Highway and rail transit tunnel maintenance and rehabilitation manual, pp. 4-1~4-19.

3.

3. Federal Highway Administration (2015), Tunnel operations maintenance inspection evaluation (TOMIE)manual, pp. 3-1~3-20.

4.

4. http://www.weather.go.kr/weather/climate/past_cal.jsp?stn=221&yy=2018&mm=1&obs=1&x=21&y=8.

5.

5. Kim, D.G. (2018), “Long-term performance of drainage system for leakage treatment of tunnel operating in cold region”, Journal of Korean Tunnelling and Underground Space Association, Vol. 20, No. 6, pp. 1177-1192.

6.

6. Kim, D.G., Jung, H.S., Bae, G.J., Shin, H.S. (2009), “Characterization of deterioration of concrete lining in tunnel structures”, Journal of Korean Tunnelling and Underground Space Association, Vol. 11, No. 4, pp. 387-394.

7.

7. Kim, D.G., Yim, M.J. (2017a), “Development and performance verification of induced drainage method for leakage treatment in existing underground structures”, Journal of Korean Tunnelling and Underground Space Association, Vol. 19, No. 3, pp. 533-549.

8.

8. Kim, D.G., Yim, M.J. (2017b), “Improvement of existing drainage system for leakage treatment in exiting underground structures”, Journal of Korean Tunnelling and Underground Space Association, Vol. 19, No. 4, pp. 669-683.

9.

9. Kim, D.G., Yim, M.J. (2017c), “Effect of freezing and thawing on the drainage system for leakage treatment”, Journal of Korean Tunnelling and Underground Space Association, Vol. 19, No. 6, pp. 1059-1075.

10.

10. Kim, Y.S., Shin, H.C., Kim, Y.G. (2012), “Waterproofing method and new technologies for construction structure”, Magazine of the Korea Concrete Institute, Vol. 24, No. 4, pp. 23-28.

11.

11. Kwon, K.J., Oh, S.G. (2008), “A performance test method of waterproofing system to evaluate the responsiveness to the movement of box culvert structure for underground electronic power facility (mock-up test method of waterproofing layer to response 10 mm movement of expansion joint)”, Magazine of the Korea Concrete Institute, Vol. 20, No. 4, pp. 57-62.

12.

12. Lee, Y.S., Park, S.W., Whang, I.B., Shin, Y.S., Kim, S.G. (2009), “Analysis of cause and deterioration about using 3-Arch tunnel”, Journal of Korean Tunnelling and Underground Space Association, Vol. 11, No. 1, pp. 97-105.

(사)한국터널지하공간학회