AE와 DRA를 이용한 초기응력의 측정에 관한 연구
In-situ Stress Measurement Using AE and DRA
(사)한국터널지하공간학회 / (사)한국터널지하공간학회, (P)2233-8292; (E)2287-4747
2001, v.3 no.1, pp.51-62
박배한
(서울대학교)
전석원
(서울대학교)
김양균
(코오롱건설 기술연구소)
박배한,
전석원,
&
김양균.
(2001). AE와 DRA를 이용한 초기응력의 측정에 관한 연구. (사)한국터널지하공간학회, 3(1), 51-62.
Abstract
In-situ stress measurement using AE (Acoustic Emission) and DRA (Deformation Rate Analysis) is usually carried outunder uniaxial loading in the laboratory and it consumes delay considered how the lateral stress and delay time influence on t he test results for the in-situ stress determination. As thedelay time increased, the accuracy of estimating the pre-stress decreased. The pre-stress of the specimen loaded onlyE) and 4% (using DRA). And the specimen on which axialpre-stress and the confining pressure were loaded had an error of less than 17% (using AE) and 14% (using DRA). Theresults of AE and DRA for field specimens were very similar wit fracturing method.
- keywords
-
AE,
DRA,
In-situ stress,
Pre-stress,
Cyclic loading,
Delay time,
Strain difference functionAE DRA . AE DRA In-situ Stress Measurement Using AE and DRA1. .(jacking method),
(stress relief method),
(hydraulicfracturing method),
AE(Acoustic Emission),
AE,
DRA,
In-situ stress,
Pre-stress,
Cyclic loading,
Delay time,
Strain difference functionAE DRA . AE DRA In-situ Stress Measurement Using AE and DRA1. .(jacking method),
(stress relief method),
(hydraulicfracturing method),
AE(Acoustic Emission)