바로가기메뉴

본문 바로가기 주메뉴 바로가기

(사)한국터널지하공간학회

New approach on prediction of fault zone ahead of tunnel face by using x - R scontrol chart for RMR parameters

(사)한국터널지하공간학회 / (사)한국터널지하공간학회, (P)2233-8292; (E)2287-4747
2010, v.12 no.6, pp.463-475




Abstract

A new approach for prediction of a fault zone ahead of tunnel face by using statistical control charts is suggested and applied to the construction site. control charts of RMR parameters were investigated as approaching and passing through fault zone. The abnormal signal from the control charts was observed and analyzed based on statistical criteria. Fault zones in the application area were predicted in advance using this method and it was verified by comparing with observation data like horizontal boring and face mapping.

keywords
Statistical control chart method, x - Rs control chart, fault zone, RMR, 통계 관리도 기법, x - Rs 관리도, 단층대, RMR 분류, Statistical control chart method, x - Rs control chart, fault zone, RMR

Reference

1.

1. 권오일, 백용, 서용석 (2008), “통계관리도 이론을 적용한 사면 계측데이터 분석시스템 개발”, 대한지질공학회학술발표회, pp. 137-143.

2.

2. 김광염, 김창용, 이정인 (2007), “계측단면중심 벡터를 이용한 터널 막장전방 단층대 예측”, 한국지반공학회지, 제23권, 제6호, pp. 6-12.

3.

3. 김창용, 홍성완, 김광염, 백승한 (2004), “터널 내공 변위 거동 분석에 관한 연구”, 터널기술, 한국터널공학회논문집, 제6권, 제3호, pp. 183-197.

4.

4. 이찬우 (1997), “막장전방 근거리 지반특성 예측을 위한 신계측 평가기술”, 대한토목학회지, 제45권, pp. 46-52.

5.

5. 임성빈, 김성권, 서용석, 박시현 (2007), “관리도 기법을 이용한 터널 변위수렴 특성에 관한 연구”, 대한지질공학회지, 제17권, pp. 197-204.

6.

6. 임성빈, 서용석 (2009), “관리도를 이용한 터널 시공현장 계측변위 분석 기법 개발”, 대한지질공학회지, 제19권, 제3호, pp. 261-268.

7.

7. Breyfogle, F. W. III (2003), Implementing Six Sigma, New Jersey, John Wiley & Sons.

8.

8. D'Agostino, R. B. and Stephens, M. A. (1986), Goodnessof-Fit Techniques, Marcel Dekker.

9.

9. Filliben, J. J. (1975), “The probability plot correlation coefficient test for normality”, Technometrics, Vol. 17, 111p.

10.

10. Lilliefore, H. W. (1967), “On the Kolmogorov-Smirnov test for normality with mean and variance unknown”, Journal of the American Statistical Association, Vol. 62, pp. 399-402.

11.

11. Lucas, J. M. and Saccucci, M. S. (1990), “Exponentially weighted moving average control schemes: Properties and Enhancements”, Technometrics, Vol. 32, pp. 1-12.

12.

12. Page, E. S. (1954), “Continuous inspection schemes”, Biometrika, Vol. 41, pp. 100-114.

13.

13. Ryan, Jr. T. A. and Joiner, B. L. (1976), Normal probability plots and tests for normality, Technical Report, Statistics Department, The Pennsylvania State University. (Available from Minitab Inc.)

14.

14. Schubert, W. and Steindorfer, A. (1996), “Selective displacement monitoring tunnel eacavation”, Felsbau, Vol. 14, pp. 93-97.

15.

15. Schubert, W. and Vavrovsky, G.M. (1994), “Interpretation of monitoring result”, World Tunnelling. pp. 351-356.

16.

16. Shapiro, S. S. and Francia, R. S. (1972), “An approximate analysis of variance test for normality”, Journal of the American Statistical Association, Vol. 67, pp. 215-216.

(사)한국터널지하공간학회