Abstract

This study aimed to estimate the axial stress and torque on a shaft in a disc cutter. The corresponding inner temperature and the surface temperature of a cutter ring were also measured by using strain gauges and thermocouples during the linear cutting tests. The maximum values of the axial stress and torque were recorded to 11.3 MPa, 171 kN․ m respectively. They have higher correlations with normal force rather than rolling force. The results of temperature measured by thermocouples during a linear cutting test showed that the rate of increase in temperature was below 0.2℃. When the cutter spacing is set to be 70 mm, the inner temperature and surface temperature of a disc cutter were 0.1℃/m, 0.15~0.17℃/m respectively. Similarly, when the cutter spacing is 90 mm, the temperature values were 0.09℃/m, 0.13~0.23℃/m respectively.

keywords
디스크커터, 커터작용력, 축응력, 토크, 온도, Disc cutter, Cutter force, Axial stress, Torque, Temperature

Reference

1.

1. Balci, C., Tumac, D. (2012), “Investigation into the effects of different rocks on rock cuttability by a V-type disc cutter”, Tunnelling and Underground Space Technology, Vol. 30, pp. 183-193.

2.

2. Chang, S.H., Choi, S.W., Lee, G.P., Bae, G.J. (2011), “Rock TBM design model derived from the multi-variate regression analysis of TBM driving data”, Journal of Korean Tunnelling and Underground Space Association, Vol. 13, No. 6, pp. 531-555.

3.

3. Chang, S.H., Choi, S.W., Park, Y.T., Lee, G.P., Bae, G.J. (2012), “Characterization of the deformation of a disc cutter in linear rock cutting test”, Journal of Korean Tunnelling and Underground Space Association, Vol. 14, No. 3, pp. 197-213.

4.

4. Entacher, M., Winter, G., Bumberger, T., Decker, K., Godor, I., Galler, R. (2012), “Cutter force measurement on tunnel boring machines-System design”, Tunnelling and Underground Space Technology, Vol. 31, pp. 97-106.

5.

5. KTA (2008), “Mechanized tunneling technologydesign”, Korean Tunneling Association, CIR, pp. 261, 278.

6.

6. Rostami, J., Ozdemir, L. (1993) “A new model for performance prediction of hard rock TBMs”, Proceedings of Rapid Excavation and Tunneling Conference (RETC), Boston, 13-17 June, pp 793- 809

7.

7. Rostami, J., Ozdemir, L., Nilsen, B. (1996) “Comparison Between CSM and NTH Hard Rock TBM Performance Prediction Models”, Proceedings of Annual Technical Meeting of the Institute of Shaft Drilling and Technology (ISDT), Las Vegas, NV, pp. 11.

8.

8. Rostami, J. (1997), “Development of a force estimation model for rock fragmentation with disc cutters through theoretical and physical measurement of crushed zone pressure”, Ph.D Dissertation, Colorado School of Mines, Golden, Colorado, pp. 68-69.

9.

9. Roxborough, F.F., Phillips, H.R. (1975), “Rock Excavation by Disc Cutter”, International Journal of Rock Mechnics and Mining Sciences and Geomechanics Abstracts, Vol. 12, pp. 361-366.

10.

10. Shanahan, A., Box, Z. (2011), “TBM Cutter Instrumentation at Malaysia’s Pahang Selangor Water Tunnel and Canada’s Niagara Tunnel Project”, Proceedings of the World Tunneling Congress (WTC) 2011, Helsinki, Finland.