바로가기메뉴

본문 바로가기 주메뉴 바로가기

(사)한국터널지하공간학회

A study on conceptual evaluation of structural stability of room-and-pillar underground space

(사)한국터널지하공간학회 / (사)한국터널지하공간학회, (P)2233-8292; (E)2287-4747
2013, v.15 no.6, pp.585-597



Abstract

In this study, in order to evaluate stability of the room-and-pillar underground structure, a series of preliminary numerical analyses were performed. Design concept and procedure of an underground structure for obtaining a space are proposed, which should be different from structural design for the room-and-pillar in mine. With assumed material properties, a series of numerical analyses were performed by varying size ratios of room and pillar and then the failure modes and location at yielding initiation were investigated. From the results, relationship between the ratio of pillar width to the roof span (w/s) and overburden pressure at failure initiation shows a relatively linear relation, and the effect of w/s on structural stability is much more critical than the ratio of pillar width and height (w/H) which is a crucial parameter in design of the room-and-pillar mining. It means that roof tensile failure and shear failure at shoulder and pillar are necessary to be considered together for confirming overall structural stability of the room-and-pillar structure, rather than considering the pillar stability only in mining. Failure modes and location at failure initiation were varied with respect to the ratio of room and pillar widths. Therefore, it is necessary to simultaneously consider stability of both roof span and pillar for design of underground structure by the room-and-pillar method.

keywords
주방식 공법, 암주, 천장부, 인장 파괴, 수치해석, Room and pillar method, Rock pillar, Roof span, Tension failure, Numerical analysis

Reference

1.

1. Carmody, J., Sterling, R. (1993), “Underground space design - A guide to subsurface utilization and design for people in underground spaces”, International Thomson Publishing company, p. 110.

2.

2. Dolinar, D.R. (2003), “Variation of horizontal stresses and strains in mines in bedded deposits in the eastern and midwestern united states”, Proceedings of 22nd International Conference on Ground Control in Mining, Morgantown, WV, Aug. 5-7, pp. 178-185.

3.

3. Esterhuizen, G.S. (2006), “Evaluation of the strength of slender pillars”, Trans Soc Min Explor Geol 320, pp. 69-76.

4.

4. Esterhuizen, G.S., Dolinar, D.R., Ellenberger, J.L. (2008a), “Pillar strength and design methodology for stone mines”, In: Proceedings of the 27th international conference on ground control in mining. Morgantown WV: West Virginia University, pp. 241-253.

5.

5. Esterhuizen, G.S., Dolinar, D.R., Iannacchione, A.T. (2008b), “Field observations and numerical studies of horizontal stress effects on roof stability in US limestone mines”, Journal of the South African Institute of Mining and Metallurgy, Vol. 108, No. 6, pp 345-352.

6.

6. Esterhuizen, G.S., Dolinar, D.R., Ellenberger, J.L, Prosser, L.J. (2011), “Pillar and roof span design guidelines for underground stone mines”, Department of Health And Human Services, NIOSH, IC 9526.

7.

7. Gonzalez-Nicieza, C., Alvarez-Fernadez, M.I., Menendez-Diaz, A., Alvarez-Vigil, A.E. (2006), “A comparative analysis of pillar design methods and its application to marble mines”, Rock Mech. Rock Engng., Vol. 39, No. 5, pp. 421-444.

8.

8. Hardy, P., Agapito, J.F.T. (1982), “Induced horizontal stress method of pillar design in oil shale”, XV Oil Shale Symp. Colorado School of Mines, Golden, Colorado.

9.

9. Hartman, H.L., Mutmansky, J.M. (2002), Introductory Mining Engineering, 2nd edtion, Wiley, New Jersey.

10.

10. Hedley, D.G.F., Grant, F. (1972), “Stope-and-pillar design for the elliot lake uranium mines”, Bull. Can. Inst. Min. Metallurg. Vol. 63, pp. 37-44.

11.

11. Hoek, E., Brown, E.T. (1980), Underground excavation in rock, Institution of Mining and Metallurgy.

12.

12. Iannacchione, A.T., Marshall, T.E., Burke, L., Melville, R., Litsenberger, J. (2003) “Safer mine layouts for underground stone mines subjected to excessive levels of horizontal stress”, Mining Engineering, Vol. 55, No. 4, pp. 25-31.

13.

13. Kimmelmann, M.R., Hyde, B., Madgwick, R.J. (1984), “The use of computer applications at BCL limited in planning pillar extraction and design of mining layouts”, In: Proc., ISMR Symp. Design and Performance of Underground Excavations. Brit. Geotech. Soc., London, pp. 53-63.

14.

14. Krauland, N., Soder, P.E. (1987), “Determinating pillar strength from pillar failure observations”, Eng. Min. J. Vol. 8, pp. 34-40.

15.

15. Lee, C., Chang, S-H, Shin, H-S, (2013), “A numerical study on evaluation of unsupported pillar strength in the room and pillar method”, J. of Korean Tunn Undergr Sp Assoc, Vol. 15, No. 4, pp 443-453 (in Korean).

16.

16. Lunder, P.J., Pakalnis, R. (1997), “Determination of the strength of hard-rock mine pillars”, Bull. Can. Inst. Min. Metall. Vol. 90, pp. 51-59.

17.

17. Mortazavi, A., Hassani, F.P., Shabani, M. (2009), “A numerical investigation of rock pillar failure mechanism in underground openings”, Computers and Geotechnics, Vol. 36, Issue 5, pp. 691-697.

18.

18. Murali Mohan, G., Sheorey, P.R., Kushwaha, A. (2001), “Numerical estimation of pillar strength in coal mines”, International Journal of Rock Mechanics and Mining Sciences, Vol. 38, Issue 8, pp. 1185-1192.

19.

19. Obert, L., Duvall, W.I. (1967), Rock mechanics and the design of structures in rock, Wiley, Londen.

20.

20. Ömer, A., Akio, S., Noritoshi, Y., Kenrou, S., Toshikazu, K. (2000) “The characteristics of soft rocks and their effects on the long term stability of abandoned room and pillar lignite mines”, Post Mining 2005, Nov. 16-17, Nancy, France.

21.

21. Potvin, Y., Hudyma, M.R., Miller, H.D.S. (1989), “Design guidelines for open stope support”, Bull. Can. Min. Metall. Vol. 82, pp. 53-62.

22.

22. Sheorey, P.R., Loui, J.P., Singh, K.B., Singh, S.K. (2000), “Ground subsidence observations and a modified influence function method for complete subsidence prediction”, Int. J. Rock Mech. Min. Sci. Vol. 37, pp. 801-818.

23.

23. Shin, Y.-W., Kim, Y.-G. (2010) “Review of mechanical behaviors of pillar in large parallel tunnel”, Journal of Korean Society for Rock Mechanics, Vol. 20, No. 3, pp. 131-144 (in Korean).

24.

24. Smith, S. (1990), Structural stability, support and excavation aspects of mine openings in stratified iron ore deposits, PhD Thesis, University of Nottingham.

25.

25. Swift, G.M., Reddish, D.J. (2002), “Stability problems associated with an abandoned ironstone mine”, Bull. Eng. Geol. Environ 61, pp. 227-239.

26.

26. Wang, S.Y., Sloan, S.W., Huang, M.L., Tang, C.A. (2011) “Numerical study of failure mechanism of serial parallel rock pillars”, J Rock Mechanics and Rock Engineering, Vol. 44, No. 2, pp 179-198.

(사)한국터널지하공간학회