A study on the risk and settlement evaluation of a shield TBM excavated in soft marine sedimentary soils

(사)한국터널지하공간학회 / (사)한국터널지하공간학회, (P)2233-8292; (E)2287-4747
2016, v.18 no.4, pp.355-364
https://doi.org/10.9711/KTAJ.2016.18.4.355


Abstract

Recently, a 3,250 meter-long tunnel was constructed beneath the sea bed formed of composite sedimentary soils to transport reusable waste heat gas of industrial complex in the west coast of Korea. Some risks such as machine settlement always exist due to the uncertainties of geological and construction factors during the subsea shield TBM tunnelling. In this construction site, the deviation of tunnel alignment caused by shield TBM settlement was occurred during excavation. It was examined that the lack of bearing capacity of soft clay was a main cause. This paper evaluates the risk of shield TBM tunnelling considering the ground conditions. Correlation between machine settlement and its advance rate was evaluated through the analytical equation in which bearing capacity is considered and a 3-D numerical analysis which can simulate the TBM advance condition (in other words, the dynamic condition). It was found out that a shield TBM could settle due to the insufficient bearing capacity of soft clay layers. In order to prevent such the problem, the best advance rate proper to the ground characteristics is needed to be applied. In the ground conditions of the section of interest, it was turned out that if the shield TBM advance rate was maintained between 35 mm/min and 40 mm/min, the machine settlement could be avoided.

keywords
Risk evaluation, Marine sedimentary soils, Subsea shield TBM tunnelling, Settlement, 위험요인 평가, 해성 퇴적토, 해저 쉴드 TBM 터널, 침하

Reference

1.

1. Hyun, K.C., Min, S.Y., Moon, J.B., Jeong, G.H., Lee, I.M. (2012), “Risk management applicable to shield TBM tunnel: Ⅰ. Risk factor analysis”, Journal of Korean Tunnelling and Underground Space Assoication, Vol. 14, No. 6, pp. 667-681.

2.

2. Kasper, T., Meschke, G. (2004), “A 3D finite element simulation model for TBM tunnelling in soft ground”, International Journal for Numerical and Analytical Methods in Geomechanics, Vol. 28, pp. 1441-1460.

3.

3. Komiya, K., Soga, K., Akagi, H., Hagiwara, T., Bolton, M.D. (1999), “Finite element modelling of excavation and advancement processes of a shield tunnelling machine”, Soil and Foundations, Vol. 39, No. 3, pp. 37-52.

4.

4. Mooney, M. A., Grasmick, J., Kenneally, B., Fang, Y. (2016), “The role of slurry TBM parameters on ground deformation: Field results and computational modelling”, Tunnelling and Underground Space Technology, Vol. 57, pp. 257-264.

5.

5. Park, J.S., Lee, E.H. (2013), “A case study on subsea tunnelling with slurry type shield TBM tunnel”, KTA 2015 Fall Symposium, pp. 93-96.

6.

6. Park, J.S., Kim, K.H., Park, C.M., Lee, S.W. (2014), “A case study on selection of small diameter shielded equipments under high water pressure conditions”, KTA 2015 Fall Symposium, pp. 63-64.

7.

7. Shimizu, M., Takatsu, S. (2001), “Case study of TBM construction”, Electric power civil engineering, Japan Electric Power Contractors Association, Inc., Vol. 294, pp. 36-38.

8.

8. Sugimoto, M., Sramoon, A. (2002), “Theoretical model of shield behaviour during excavation. I :Theory”, Journal of Geotechnical and Geoenvironmental Engineering, Vol. 128, No. 2, pp. 138-155.

9.

9. Terzaghi, K. (1943), Theoretical Soil Mechanics, New York: John Wiley and Sons, p. 510.

10.

10. Vesic, A.S. (1975), “Bearing Capacity of Shallow Foundations. Foundation Engineering Handbook”, Winterkorn, H.F., Fang, H., Eds., Van Nostrand Reinhold, Co., p. 751.

11.

11. eTEC E&C (2013a), GE3 Project General Design Report, p. 65.

12.

12. eTEC E&C (2013b), GE3 Project Geotechnical Report, p. 108.

13.

13. Itasca Consulting Group, Inc. (2009), Fast Lagrangian Analysis of Continua in 3 Dimensions (Version 5.0). User Manual, Minnesota, USA.