With the increased development in downtown underground space facilities that vertically cross under a railway at a shallow depth, the demand for non-open cut method is increasing. However, most construction sites still adopt the pipe roof method, where medium and large diameter steel pipes are pressed in to form a roof, enabling excavation of the inside space. Among the many factors that influence the loosening region and loads that occur while pressing in steel pipes, the size of the pipe has the largest impact, and this factor may correspond to the magnitude of load applied to the underground structure inside the steel pipe roof. The super equilibrium method (SEM) has been developed to minimize ground disturbance and loosening load, and uses small diameter pipes of approximately 114 mm instead of conventional medium and large diameter pipes. This small diameter steel pipe is called an SEM pile. After SEM piles are pressed in and the grouting reinforcement is constructed, a crossing structure is pressed in by using a hydraulic jack without ground subsidence or heaving. The SEM pile, which plays the role of timbering, is a fore-poling pile of approximately 5 m length that prevents ground collapse and supports surface load during excavation of toe part. The loosening region should be adequately calculated to estimate the spacing and construction length of the piles and stiffness of members. In this paper, we conducted a comparative analysis of calculations of loosening load that occurs during the press-in of SEM pile to obtain an optimal design of SEM. We analyzed the influence of factors in main theoretical and empirical formulas applied for calculating loosening regions, and carried out FEM analysis to see an appropriate loosening load to the SEM pile. In order to estimate the soil loosening caused by actual SEM-pile indentation and excavation, a steel pipe indentation reduction model test was conducted. Soil subsidence and soil loosening were investigated quantitatively according to soil/steel pipe (H/D).

keywords
탄소성 해석, 비개착식 터널, SEM공법, 포어폴링 공법, 이완하중, Elasto-plastic analysis, Non-open cut tunnel, SEM method, Fore poling method, loosening loads

Reference

1.

Engesser, F. (1882), Uber den Erddruck gegen innere stutzwande, Deutsche Bauzeitung: 36, Geotechnique 30, No. 4, 397-416.

2.

Kommerell, O. (1912), Grundlagen fur die statische Berechnung von Tunnelmauerwerk, 2. Aufl. Ernst & Sohn, Berlin, pp. 705-715.

3.

Leca, E., New, B. (2007), "Settlements induced by tunnelling in soft ground, ITA Report 2006", Tunnelling and Underground Space Technology, Vol. 22, No. 2, pp.119-149.

4.

Lee, K.M., Rowe, R.K., Lo, K.Y. (1992), "Subsidence owing to tunnelling. I. Estimating the gap parameter," Canadian Geotechnical Journal, Vol. 29, No. 6, pp. 929-940.

5.

Protodyakonov, M. (1968), Mechanical Properties of Rocks, Rock Mechanics, Berlin, pp. 379-387.

6.

Rose, D. (1982), "Revising Terzaghi's tunnel rock load coefficient", Proceedings of the 23rd U.S. Symposium on Rock Mechanics, AIME, New, Berkeley, pp. 669-674.

7.

Rowe, R.K., Lee, K.M. (1992), "Subsidence owing to tunnelling. II. Evaluation of a prediction technique," Canadian Geotechnical Journal, Vol. 29, No. 6, pp. 941-954.

8.

Terzaghi, K. (1946), "Rock Defects and Loads on Tunnel Support", Rock Tunneling with Steel Supports, eds. R. V. Proctor and T. White, Com-mercial Shearing Co., Youngstown, Ohio, USA, pp. 15-99.

9.

Terzaghi, K. (1948), Theoretical Soil Mechanics, John Wiley & Sons, Wien, pp. 379-386.