Reduced model experiment to review applicability of tunnel pillar reinforcement method using prestress and steel pipe reinforcement grouting

(사)한국터널지하공간학회 / (사)한국터널지하공간학회, (P)2233-8292; (E)2287-4747
2022, v.24 no.6, pp.495-512
https://doi.org/10.9711/KTAJ.2022.24.6.495





Abstract

Due to the concentration of population in the city center, the aboveground structuresare saturated, and the development of underground structures becomes important. In addition, it is necessary to apply the reinforcement construction method for the pillar part of the adjacent tunnel that can secure stability, economy, and workability to the site. In this study, the tunnel pillar reinforcement method using prestress and grouting was reviewed. There are various reinforcement methods that can compensate for the problems of the side tunnel, but as the tunnel pillar construction method using prestress and grouting is judged to be excellent in field applicability, stability, and economic feasibility, it is necessary to review the theoretical and numerical analysis of the actual behavior mechanism. Therefore, a scaled-down model experiment was conducted. The reduced model experiment was divided into PC stranded wire steel pipe reinforcement grouting prestress (Case 1), PC strand steel pipe reinforcement grouting (Case 2), and no reinforcement (Case 3), and the displacement of the pillar and the earth pressure applied to the wall were measured. Through experiments, it was confirmed that the PC stranded wire steel pipe reinforcement grouting +prestress method is the most excellent reinforcement method among various construction methods. It was judged that it could be derived.

keywords
Prestress, Grouting, Side tunnel, Pillar, Model experiment, 프리스트레스, 그라우팅, 병설터널, 필라부, 모형 실험

(사)한국터널지하공간학회