Load-transfer mechanism in the ground with discontinuity planes during tunnel excavation

(사)한국터널지하공간학회 / (사)한국터널지하공간학회, (P)2233-8292; (E)2287-4747
2002, v.4 no.1, pp.71-78



Abstract

In this study, the influence of the presence of discontinuity planes on the load transfer mechanism and the pattern of loosening zone was studied based on the laboratory test. The trap-door and the reaction plates are installed as the bottom plane of the model box. The vertical discontinuity plane is installed in the dry sand. Various overburden heights and locations of discontinuity planes are applied as major factors in this study. The results show that at higher overburden heights over about 1.5 times the excavation width, the ratio of the transferred stress to the in-situ stress converges to a certain value even if the overburden height increases further. The results also show that the discontinuity plane gives relatively larger influence on the load transfer mechanism, that produces the unsymmetrical load concentration, when the discontinuity plane locates within the tunnel width. When the discontinuity plane locates outside the tunnel width, the unsymmetrical load concentration is reduced considerably.

keywords
Load transfer, Loosening zone, Discontinuity plane, Trap-door, Reaction plate, Overburden ratio, Earth pressure ratio, 하중전이, 이완영역, 불연속면, 가동판(trap-door), 바닥판(reaction plate), 토층비, 토압비

(사)한국터널지하공간학회