바로가기메뉴

본문 바로가기 주메뉴 바로가기

(사)한국터널지하공간학회

A study on the improvement in decision making analysis for the selection of tunnel construction method

(사)한국터널지하공간학회 / (사)한국터널지하공간학회, (P)2233-8292; (E)2287-4747
2002, v.4 no.4, pp.261-276




Abstract

Recently, for the purpose of choosing reasonable and economical construction, the decision making analyses, such as VE (Value Engineering) and LCC (Life Cycle Cost), are generally performed. But, these methods have some limitations for the application to subway tunnel construction method. So, the AHP (Analytical Hierarchy Process) analysis is applied to determine relative importance for obtaining objectivity in quantitative analysis. And, the LCSC (Life Cycle Social Cost) method is developed to account for the social loss and risk by tunnel construction. From the case of the subway lot, those methods are very useful to decision making analysis. And, in that case, both quantitative and quantitative analysis appraisement, the drilling and blasting method is evaluated useful alternative proposal in comparing with the cut and cover method.

keywords
VE and LCC analyses, AHP analysis, LCSC method, VE and LCC analyses, AHP analysis, LCSC method, VE 및 LCC 기법, AHP기법, LCSC 기법

(사)한국터널지하공간학회