바로가기메뉴

본문 바로가기 주메뉴 바로가기

(사)한국터널지하공간학회

Pillar Load in 2 Arch Tunnel in the Jointed Rocks

(사)한국터널지하공간학회 / (사)한국터널지하공간학회, (P)2233-8292; (E)2287-4747
2007, v.9 no.1, pp.91-97

Abstract

on the pillar and ground deformation in 2-arch tunnel, which is excavated in the rock mass with regular discontinuities, depending on the dips of discontinuities and the construction sequences were experimentally studied. Large scale model tests in the biaxial test facility were performed. Tested model (width 3.3m, height 3.0m, and length 0.45m) for 2-arch tunnel in 1/10 scale were built with various dips. Test results show that discontinuities have greate affects on the behavior of the 2-arch tunnel, especially on the pillar loads and ground deformation.

keywords
2-Arch 터널, 절리암반, 터널굴착단계, 필라하중, 터널주변지반변형, 2-Arch tunnel, construction sequences, pillar loads, ground deformation

Reference

1.

(2003) 사질토 지반에서 2-Arch 터널의 거동,

2.

(2004) 라이닝 강성에 따른 2-Arch 터널 필라부의 거동,

3.

(1985) On structural design models for tunnels in soft soil, Vol. 9. Pergamon Press

4.

(2002) Influence of the discontinuity planes on the Shallow Tunnel,

5.

(1989) Numerical modeling of the trap door problem,

6.

(1997) A study on design methods for twin tunnel constructed by the single drift and central pier method,

7.

(1998) Ground behavior and settlement control of twin tunnels in soil ground,

8.

(1936) Stress distributionin dry and in saturated sand above a yielding trap-door,

9.

(1981) Trap-door problem with Dry Sand A statical approach based upon model test Kinematics,

(사)한국터널지하공간학회