바로가기메뉴

본문 바로가기 주메뉴 바로가기

(사)한국터널지하공간학회

Vol.20 No.1

초록보기
Abstract

Visibility is very poor in tunnel fire because of confined space where the fire may easily lead to the mass casuality incident because of fast smoke spread. In this test, air curtain and the fan were installed at rescue station in a bid to make use of rescue station in safe way during the train fire in undersea tunnel and a full-scale fire test was conducted to identify the applicability of air curtain system. Air curtain system was installed at a real rescue station and the test was continued for 2 minutes till heptane which was used as fire source was completely burned out. When air curtain was working, difference in temperature between inside and outside the platform was 160°C and carbon monoxide measured inside the platform was less than the case of no air curtain system by 160 ppm. Thus a full-scale fire test demonstrated that the air curtain system installed at rescue station in undersea tunnel was able to effectively block the heat and smoke generated from the fire.

초록보기
Abstract

The safety of tunnels is quantified by quantitative risk assessment when planning the disaster prevention facilities of railway tunnels, and it is decided whether they are appropriate. The purpose of this study is to estimate the probability of the train stopping in the tunnels at train fire, which has a significant effect on the results of quantitative risk assessment for tunnel fires. For this purpose, a model was developed to calculate the coasting distance of the train considering the coefficient of train running resistance. The probability of stopping in case of train fire in the tunnel is predicted by the Monte Carlo simulation method with the coasting distance and the emergency braking distance as parameters of the tunnel lengths and slopes, train initial driving speeds. The kinetic equations for predicting the coasting distance were analyzed by reflecting the coefficient train running resistance of KTX II. In the case of KTX II trains, the coasting distance is reduced as the slope increases in a tunnel with an upward slope, but it is possible to continue driving without stopping in a slope downward. The probability of the train stopping in the case of train fire in tunnel decreases as the train speed increases and the slope of the tunnel decreases. If human error is not taken into account, the probability that a high-speed train traveling at a speed of 250 km/h or above will stop in a tunnel due to a fire is 0% when the slope of the tunnel is 0.5% or less, and the probability of stopping increases rapidly as the tunnel slope increases and the tunnel length increases.

초록보기
Abstract

Up to now, most of studies on seismic analysis have been limited to analyze buildings and underground structures individually so that the interaction between them could not be analyzed effectively. Thus, in this study, a dynamic analysis was conducted for soil-structure interaction with a complex underground facility composed of a building and an adjacent underground structure constructed on a surface soil and the bed rock ground conditions. Seismic stability was analyzed based on interstory drift ratio and bending stress of structure members. As a result, an underground structure has more effect on a high-rise building than a low-rise building. However the above structures were proved to be favorable for seismic stability. On the other hand, tensile bending stresses exceeded the allowable value at the underground part of the building and the adjacent underground structure so that it turned out that the underground part could be weaker than the above part. Therefore, it is inferred that above and underground structures should be analyzed simultaneously for better prediction of their interaction behavior during seismic analyses because there exist various structures around buildings in big cities.

초록보기
Abstract

Generally, the total ventilation resistance coefficient in a tunnel consists of inlet/outlet loss coefficient, wall friction coefficient, and other loss coefficient caused by sudden expansion and contraction of cross-section, etc. For the tunnel before opening, when the running ventilation fan is stopped, the wind speed in the tunnel is reduced by the total ventilation resistance drag. The velocity decay method is comparatively stable and easy to estimate the wall friction coefficient in the pre-opening tunnel. However, the existing study reported that when the converging wind speed is a negative value after the ventilation fan stops, it is difficult to estimate the wall friction coefficient according to the velocity decay method. On the other hand, for the operating tunnel in which the piston effect acts, a more complex process is performed; however, a reasonable wall friction coefficient can be estimated. This paper aims at suggesting a method to minimize the measurement variables of the piston effect and reviewing a method that can be applied to the operating tunnel. Also, in this study, a new method has been developed, which enables to calculate an variation of the piston effect if the piston effect is constant with a sudden change of external natural wind occurring while the wind speed in the tunnel decreases after the ventilation fan stops, and a programming logic has been also developed, which enables dynamic simulation analysis in order to estimate the wall friction coefficient in a tunnel.

초록보기
Abstract

A method that can predict the mixed-ground condition ahead of a TBM tunnel face during tunnel construction utilizing electrical resistivity and induced polarization (IP) was proposed in this study. Effect of TBM advancement approaching the mixedground condition (composed of soil layer overlying rock layer) when currently running through soil zone on the electrical resistivity and IP measuring was assessed with laboratory-scale experiments. The resistivity and IP values were measured using four electrodes, by installing two electrodes on the tunnel face (at the cutterhead), and the other two electrodes on the segment lining. The test results showed that both of the measured resistivity and IP values were kept increasing as the TBM is approaching the soil-rock mixed-ground. Also, to get the more reliable results for predicting the mixed-ground condition, it was recommended that the measurement is made at the tunnel face utilizing 4-electrodes installed at the cutterhead as well as it is made utilizing the 2-electrodes installed at the segment lining along with the 2-electrodes installed on the tunnel face (at the cutterhead) so that two measured results are compared each other.

초록보기
Abstract

The purpose of this study is to research the regulation of durability standard of underground structures monitoring sensors. The durability criteria for construction monitoring sensors of domestic construction companies, the standard years of contents such as buildings on the income tax implementation regulations, and the standards of the Public Procurement Service for construction monitoring and construction machinery were analyzed. The durability criterion on products such as the inclination meter and the strain gauge, which are purchased from the Public Procurement Service prior to installation on the underground structure, is 8 to 10 years. It is considered that the monitoring sensor installed in the paperboard and the concrete structure at the time of construction will have considerably shortened service life rather than the useful life of the product itself due to various adverse factors such as groundwater influence and compaction.

초록보기
Abstract

Tunnels are widely used for special purposes including roads, railways and culvert for power transmission, etc. Its cross-section shape is determined by uses, ground condition, environmental or economic factor. Many papers with respect to behaviours of adjacent ground and existing structure tunnelling-induced have been published by many researchers, but tunnel cross-section have rarely been considered. A collapse of tunnel causes vaster human and property damage than structures on the ground. Thus, it is very important to understand and analyse the relationship between behavoiurs of ground and cross-section type of tunnel. In this study, the behaviour of ground due to tunnel excavation for underground station below the grouped pile supported existing structure was analysed through laboratory model test using a trap-door device. Not only two cross-section types, 2-arch and box, as station for tunnel, but also, offset between tunnel and grouped pile centre (0.1B, 0.25B, 0.4B) are considered as variable of this study. In order to measure underground deformation tunnelling-induced, Close Range Photogrammetry technique was applied with laboratory model test, and results are compared to numerical analysis.

초록보기
Abstract

Recently, the limit state design method in the design of the structure is in global trend, but it is limited to a few structures in Korea. Since the introduction of the limit state design method has recently been attempted for tunnels, which are the main underground structures, it is surely necessary to understand the latest limit state design method. Therefore, based on the recently published AASHTO LRFD Road Tunnel Design and Construction Guide Specification (2017), structural load factors and load combinations were reviewed, and various factors which should be applied for the review of structures have been analyzed. In this study, utility tunnel section and subway tunnel sections used in Korea were analyzed by the limit state design method, and we have analyzed the direction of application of limit state design method through studying the tendency of member force by various influential factors such as ground conditions, load modifier and joint stiffness.

초록보기
Abstract

The VE/LCC study on the existing multi-utility tunnel examined the economical feasibility of the collective area through the cost-benefit analysis of the ten major routes of Seoul for the benefit (7 items) and the cost (5 items) through quantitative methods. In this paper, we analyzed the economic efficiency of 61 sectors by adding 3 items (reduced traffic accident, reduced vehicle noise, social-economic loss). The reduced traffic accident item is an improvement of the traffic accident cost that can be saved by the implementation of the project, and the reduced vehicle noise item is an indicator of the amount of noise change caused by the implement of the business. Finally, the social-economic loss items represent the impact on the local economy due to the construction of the multi-utility tunnel. The amounts of the additional items were compared and items added in the open type and tunnel type multi-utility tunnel were analyzed for each analysis. Result on the analysis, it analyzed the items applied to the basic and detail models in the economic evaluation of the multi-utility tunnel design, and makes it possible to evaluate the economic efficiency more efficiently. The economic evaluation of the basic and detailed models including the items presented in this study will be often used in the design of the multi-utility tunnel design.

초록보기
Abstract

The urban center of a large city has a high concentration ratio of population, commerce, and traffic. Therefore, the expected effect is high from the introduction of the urban utility tunnel and it also has sufficient economic feasibility considering life cycle cost. Moreover, the construction cost can be greatly reduced if it is included in a large underground development such as a subway or a complex transfer center construction. However, it is not reflected in actual underground development plan. When planning a urban utility tunnel in Korea, it is expected to have difficulties such as the cost of relocation of the existing Life-Line, conflicts among the individual facility institutions, procurement of construction resources and sharing. Furthermore, it is possible to promote the project only if a consensus is drawn up by a collective council composed of all facilities and project developers. Therefore, an optimal alternative should be proposed using economic analysis and feasibility assessment system. In this study, the analytic hierarchy process (AHP) is performed considering the characteristics of urban areas and the importance of each indicator is quantified. As a result, we can support reasonable design capacity optimization using the feasibility assessment system.

초록보기
Abstract

Long subsea tunnel is subject to many restrictions in terms of spatial limitation when vertical or inclined shafts are built for tunnel ventilation. So, the construction of some artificial island is required to provide ventilation. But, because of construction difficulty and cost increase, it is necessary to minimize the artificial island construction. As a result, ventilation distance become longer and supply airflow becomes excessive due to air leakage, So, duct mounting for temporary ventilation is impossible or fan pressure and power increase exponentially. Therefore, in order to build a long subsea tunnel, it is necessary to overcome these practical problems and to develop technical solution that can keep the comfortable condition of tunnel environment during construction. In previous study, we have found that air leakage is the key factor in solving these problems and experimental results show that the new connection method has a leakage rate of about 1.46 mm2/m2 (Jo et al., 2017). In this study, we present the experimental results of the measurement of the leakage rate of the prototype with the new connection method, and analyze experimentally the improvement of the leakage rate when applying the flexible cover inside the duct to improve the leakage performance of the existing connection method.

초록보기
Abstract

We carried out a series of linear cutting machine tests to assess the cutting performance of a pick cutter in sedimentary rock. The specimens were Linyi sandstone from China and Concrete (rock-like material, conglomerate). Using the small scaled LCM system, we estimated the cutter force and specific energy under different cutting conditions. The cutter forces (cutting and normal) increased with penetration depth and cutter spacing in two rock types, and it was affected by the strength of specimens. On the other hand, the ratio of the peak cutter force to the mean cutter force was influenced by cutting characteristic and composition of rock rather than rock strength. The cutting coefficient was affected by the friction characteristic between rock and pick cutter rather than the cutting conditions. Therefore, the optimal cutting angle can be determined by considering of cutting coefficient and resultant force of pick cutter. The optimum cutting condition was determined from the relationship between the specific energy and cutting condition. For two specimens, the optimum s/p ratio was found to be two to four, and the specific energy decreased with the penetration depth. The result from this study can be used as background database to understand the cutting mechanism of a pick cutter, also it can be used to design for the mechanical excavator.

초록보기
Abstract

Recently, the need for research on vertical shaft excavation is increasing with the increase of the demands for the underground and utility tunnels. As a part of the R&D project of the Ministry of Land, Infrastructure and Transport, CUT (center for utility tunnel) has developed “Ring cut method”. “Ring cut method” is a method to improve the stability of the ground against the basal heave by excavator wall pre-penetration during vertical shaft excavation. In this study, the basal heave was simulated by centrifugal model test. The basal heave, ground subsidence, and ground deformation of surrounding ground were analyzed by soil plug effect from wall pre-penetration. It was found that the soil plug could control the basal heaving and ground subsidence, and verified that the ‘Ring cut method’ could be a good countermeasure for the ground stability against the basal heave.

초록보기
Abstract

This paper presents a study on the reduction of concrete lining re-bar according to the tunnel design factors. The design of the concrete lining increases the reinforcing re-bar according to the application of excessive load, and the economical efficiency is reduced. In order to improve the economical efficiency of tunnel construction, rational standards are required for the design factors of concrete lining. Therefore, this research analyzed the characteristics and problems of the design factors applied to the design of concrete lining. Also, the economical review of the concrete lining for design factor application was compared with the amount of reinforcing re-bar calculated from the section design using numerical analysis. The results show that the amount of re-bar is varied according to the design factors. That is, the required amount for re-bar in the tunnel concrete lining could be reduced in the design stage. The results of this study may be useful for economic design of concrete lining in the future.

초록보기
Abstract

It is important to design tunnel support system considering the various loads acting on the tunnel because they have a direct impact on the stability of tunnels. In Korea, standardized support patterns are defined based on the rock mass classification system depending on the project, and it is stated that it should be modified appropriately considering the behavior of tunnel during construction. In this study, the tunnel support pattern optimization method is suggested based on the convergence-confinement method, earth pressure, axial force of rock bolt, and moment acting on the shotcrete. The length and spacing of the rock bolts and the thickness of the shotcrete were optimized by using the differential evolution algorithm (DEA) and the results were compared to the standard support pattern III for railway tunnel. Rock bolt length can be reduced and the installation interval can be widened for shallow tunnel. As the depth of tunnel increases, the thickness of shotcrete increases linearly. Therefore, the thickness of shotcrete should be thicker than the standard support pattern as the depth of tunnel increases to secure the stability of tunnel.

초록보기
Abstract

Domestic urban areas are experiencing serious traffic congestion problems due to continuous population growth and increased traffic volume. In order to solve the problem of traffic congestion, the study of great depth underground double deck tunnels using underground space is being actively carried out in the urban areas. The characteristics of great depth underground double deck tunnels are low in cross section, so the spread of fire smoke is expected to spread faster than the road tunnel in case of fire. Therefore, it is necessary to provide a fire smoke delay device which delays the spread of fire smoke when a fire occurs in a tunnels. In the previous study, the diffusion effect was analyzed according to the blocking area when the fire smoke spread delay device was operated through the 3D CFD in the study of preventing the smoke spread in the case of the tunnel fire. A study on fire smoke diffusion delay device using spring elasticity which is excellent in applicability to a tunnel and economical value is studied. In this study, fire smoke spread delay system was developed to fire smoke delay was experimentally analyzed. Fire smoke delay effect of fire smoke delay device appeared. Therefore, it is considered that the can minimize the damage of the victims when installed in the great depth underground double deck tunnels.

(사)한국터널지하공간학회